Lunar Orbiter V Mission

Lunar Orbiter 5, the last of the Lunar Orbiter series, was designed to take additional Apollo and Surveyor landing site photography and to take broad survey images of unphotographed parts of the Moon’s far side. It was also equipped to collect selenodetic, radiation intensity, and micrometeoroid impact data and was used to evaluate the Manned Space Flight Network tracking stations and Apollo Orbit Determination Program. The spacecraft was placed in a cislunar trajectory and on August 5, 1967 was injected into an elliptical near polar lunar orbit 194.5 by 6,023 kilometres (120.9 3,743 mi) with an inclination of 85 degrees and a period of 8 hours 30 minutes. On August 7 the perilune was lowered to 100 kilometres (62 mi), and on August 9 the orbit was lowered to a 99-by-1,499-kilometre (62 931 mi), 3 hour 11 minute period.

Continue reading “Lunar Orbiter V Mission”

Lunar Orbiter 5 Mission

Alternate Names: Lunar Orbiter-E, 02907
Launch Date: 1967-08-01
Launch Vehicle: Atlas-Agena D
Launch Site: Cape Canaveral, United States
Mass: 385.6 kg
Nominal Power: 375.0 W
Launch/Orbital information for Lunar Orbiter 5
Experiments on Lunar Orbiter 5
Data collections from Lunar Orbiter 5
Description
Lunar Orbiter 5, the last of the Lunar Orbiter series, was designed to take additional Apollo and Surveyor landing site photography and to take broad survey images of unphotographed parts of the Moon’s far side. It was also equipped to collect selenodetic, radiation intensity, and micrometeoroid impact data and was used to evaluate the Manned Space Flight Network tracking stations and Apollo Orbit Determination Program. The spacecraft was placed in a cislunar trajectory and on 5 August 1967 was injected into an elliptical near polar lunar orbit 194.5 km x 6023 km with an inclination of 85 degrees and a period of 8 hours 30 minutes. On 7 August the perilune was lowered to 100 km and on 9 August the orbit was lowered to a 99 km x 1499 km, 3 hour 11 minute period. The photographic portion of the mission ended on 18 August.

Continue reading “Lunar Orbiter 5 Mission”